Leed Title Siemens Logo
 
Home
About Green Buildings
Tools & Resources

Credit 3 Construction IAQ Management Plan: During Construction
Intent Reduce indoor air quality problems resulting from the construction/renovation process in order to help sustain the comfort and well-being of construction workers and building occupants
Requirement Develop and implement an Indoor Air Quality (IAQ) Management Plan for the construction and pre-occupancy phases of the building as follows: a) During construction meet or exceed the recommended Control Measures of the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) IAQ Guidelines for Occupied Buildings under Construction, 1995, Chapter 3. b) Protect stored on-site or installed absorptive materials from moisture damage. c) If permanently installed air handlers are used during construction, filtration media with a Minimum Efficiency Reporting Value (MERV) of 8 shall be used at each return air grille, as determined by ASHRAE 52.2-1999. Replace all filtration media immediately prior to occupancy
Siemens Solution Description SBT's Indoor Environmental Quality Model Document is available
Siemens Solution Details
Energy & Environmental Solutions
  • IEQ Assessments and Plans
 

 

Contact Us

© 2007 Siemens Building Technologies Inc.