Leed Title Siemens Logo
 
Home
About Green Buildings
Tools & Resources

Prereq 1 Outside Air Introduction & Exhaust Systems
Intent Establish minimum indoor air quality (IAQ) performance to enhance indoor air quality in buildings, thus contributing to the health and well-being of the occupants
Requirement A) Modify or maintain existing building outside-air (OA) ventilation distribution system to supply at least the outdoor air ventilation rate required by ASHRAE 62.1-2004. If this is not feasible due to the physical constraints of the existing ventilation system, modify or maintain the system to supply at least 10 cubic feet per minute (CFM) per person. B) Implement and maintain an HVAC System Maintenance Program to ensure the proper operations and maintenance of HVAC components as they relate to IAQ. C) Test and maintain the operation of all building exhaust systems, including bathroom, shower, kitchen and parking exhaust system
Siemens Solution Description Provide continual monitoring, reporting and alarming
Siemens Solution Details
Building Automation Solutions
  • APOGEE Automation
  • APOGEE Alarming/RENO
  • APOGEE Runtime Exports to CMM
  • APOGEE Insight Reports
  • APOGEE Graphics/ Web Options
  • InfoCenter Suite
  • Anthem and Building Commissioning
  • Demand Control Ventilation (DCV)
  • CO2 Sensors
  • Temperature Sensors
  • Flow and other Sensors
  • Humidity Sensors
  • Occupancy Sensors
Energy & Environmental Solutions
  • Continuous Energy Commissioning
  • IEQ Assessments and Plans
  • LEED Advisory Services
  • Environmental Reporting & Monitoring
  • Energy Saving Facility Improvement Measures
  • Measurement and Verification
Technical Support Services
  • Mechanical Services
  • Assessment Surveys
Financial Services
  • TSP+ Service Agreement
  • Performance Service Agreements
  • Utility Services Agreements
 

 

Contact Us

© 2007 Siemens Building Technologies Inc.